| Field / Location: |
Application: |
Operator: |
Time: |
| Ekofisk / North Sea |
Separators scanning and defoamer test |
ConocoPhillips |
Winter 10 |
| Heidrun / North Sea |
Separator phase profile scanning after maintenance stop |
StatoilHydro |
AUtumn 09 |
| Knock Allan - Olowi / Gabon West-Africa |
Troubleshooting of crude oil dehydration and desalination process plant |
Fred Olsen Production Ltd. |
Autumn 09 |
| Oseberg A / North Sea |
Capacity Window Verification of Inlet 3p Separator |
StatoilHydro |
Autumn 09 |
| Kristin / North Sea |
Production Chemicals Testing and Separator Phase Profil Scanning after Tyrihans Tie-in |
StatoilHydro |
Autumn 09 |
| Heidrun / North Sea |
Separator phase profile scanning |
StatoilHydro |
Spring 09 |
| Troll C / North Sea |
Troubleshooting of inlet 3ph separator |
StatoilHydro |
Winter 09 |
| Hummingbird / North Sea |
Crude oil separability verification |
Sevan Marine |
Winter 09 |
| Gullfaks C / North Sea |
Independent 3rd party verification of non-commercial inline technology |
StatoilHydro |
Winter 09 |
| Heidrun / North Sea |
Separator phase profile scanning |
StatoilHydro |
Winter 09 |
| Bressay Field UK / North Sea |
Extended well test heavy oil |
StatoilHydro |
Fall 08 |
| Troll C - Fram / North Sea |
Verification of liquid carry-over by radioactive tracers |
StatoilHydro |
Fall 08 |
| Foinaven / North Sea |
Desander testing |
Teekay Petrojarl |
Spring 08 |
| Åsgard A / North Sea |
Testing of emulsion breakers |
StatoilHydro |
Spring 08 |
| Ekofisk 2/4 J / North Sea |
Verification of three-phase separators |
ConocoPhillips |
Spring 08 |
| Snorre A - Vigdis / North Sea |
Verification of liquid carry-over by radioactive tracers |
StatoilHydro |
Spring 08 |
| Kristin / North Sea |
Process mapping oil train and produced water treatment |
StatoilHydro |
Winter 08 |
| Eldfisk B / North Sea |
Gas Lift and Separation Study |
ConocoPhillips |
Winter 08 |
| Snorre A / North Sea |
New defoamer verification |
StatoilHydro |
Winter 08 |
| Ekofisk / North Sea |
Verification of separator condition |
ConocoPhillips |
Winter 08 |
| Snorre B / North Sea |
Verification of separators condition |
StatoilHydro |
Fall 07 |
| Oseberg C / North Sea |
New defoamer verification |
StatoilHydro |
Fall 07 |
| Heidrun / North Sea |
Verification of separators condition |
StatoilHydro |
Fall 07 |
| Yanga and Sendji / Congo |
Separation Optimization |
Total |
Fall 07 |
| Rafnes / Onshore Bamble |
Thermography and de-bottlenecking |
Norsk Hydro |
Fall 07 |
| Norne / North Sea |
New defoamer verification |
Statoil |
Fall 07 |
| Halfdan / North Sea |
Verification of separators condition |
Mærsk Oil & Gas |
Fall 07 |
| Heidrun / North Sea |
Verification of separators condition |
Statoil |
Summer 07 |
| Heidrun / North Sea |
Emulsion breaker testing |
Statoil |
Spring 07 |
| Tchibouela / Congo |
Verification of 3-phase separators performance |
Total |
Spring 07 |
| Heidrun / North Sea |
New defoamer verification |
Statoil |
Winter 07 |
| Kårstø / Onsh. Norway |
Liq. carry-over scrubbers (tracer test) |
Statoil |
Winter 07 |
| Gullfaks C / North Sea |
Well screening |
Statoil |
Winter 07 |
| Grane / North Sea |
Separator train and prodwater condition |
Norsk Hydro |
Winter 07 |
| Ekofisk / North Sea |
Defoamer and capacity test |
ConocoPhillips |
Winter 07 |
| Heidrun / North Sea |
New defoamer start-up |
Statoil |
Winter 07 |
| Norne / North Sea |
Sep. verification and defoamer |
Statoil |
Fall 06 |
| Gullfaks A / North Sea |
Defoamer optimization |
Statoil |
Fall 06 |
| Troll C / North Sea |
Separators verification and em.breaker |
Norsk Hydro |
Fall 06 |
| Heidrun / North Sea |
Defoamer optimization |
Statoil |
Fall 06 |
| Grane / North Sea |
Verification of separators condition |
Norsk Hydro |
Summer 06 |
| Snorre/Vigdis / North Sea |
Liq. carry-over scrubbers (tracer test) |
Statoil |
Summer 06 |
| Heidrun / North Sea |
Defoamer and emulsion breaker |
Statoil |
Summer 06 |
| Norne / North Sea |
Emulsion breaker testing |
Statoil |
Summer 06 |
| Heidrun / North Sea |
Verification of separators condition |
Statoil |
Spring 06 |
| Valhall / North Sea |
Verification on new well start-up |
BP |
Spring 06 |
| Heidrun / North Sea |
Verification of separators condition |
Statoil |
Winter 06 |
| Grane / North Sea |
Separators and prodwater verification |
Norsk Hydro |
Winter 06 |
| Fram/Troll C / North Sea |
Capacity testing Fram Vest separator |
Norsk Hydro |
Winter 06 |
| Gullfaks C / North Sea |
Well screening |
Statoil |
Winter 06 |
| Statfjord B / North Sea |
Well screening |
Statoil |
Fall 05 |
| Ekofisk / North Sea |
Separator and scrubber verification |
ConocoPhillips |
Fall 05 |
| Grane / North Sea |
Separation troubleshooting |
Norsk Hydro |
Fall 05 |
| Heidrun / North Sea |
Verification of separator condition |
Statoil |
Fall 05 |
| Gullfaks C / North Sea |
Antifoam chemical testing |
Statoil |
Fall 05 |
| Heidrun / North Sea |
Troubleshooting, interface optimiz. |
Statoil |
Summer 05 |
| North Alwyn / North Sea |
Separation verification, troubleshooting |
Total, UK |
Spring 05 |
| Valhall / North Sea |
Test of oil/water separation equipment |
BP |
Spring 05 |
| Heidrun / North Sea |
Verification of separators condition |
Statoil |
Spring 05 |
| Ekofisk II / North Sea |
Demulsifyer test |
ConocoPhillips |
Winter 05 |
| Valhall / North Sea |
Separation verification, troubleshooting |
BP |
Winter 05 |
| Åsgard B / North Sea |
MEG separator verification and antifoam testing |
Statoil |
Winter 05 |
| Kolsnes / Onsh. Norway |
Liq. carry-over scrubbers (tracer test) |
Statoil |
Fall 04 |
| Statfjord C / North Sea |
Antifoam chemical testing |
Statoil |
Fall 04 |
| Grane / North Sea |
Separation verification, troubleshooting |
Norsk Hydro |
Fall 04 |
| Statfjord B / North Sea |
Solids verifications before/after jetting |
Statoil |
Fall 04 |
| Heidrun / North Sea |
Minox foam verifications |
Statoil |
Fall 04 |
| Åsgard A / North Sea |
Antifoam chemical testing |
Statoil |
Fall 04 |
| Ming Zhu / China |
Water in heavy oil verification |
ConPhil, USA |
Fall 04 |
| Heidrun / North Sea |
Separators internals verifications |
Statoil |
Fall 04 |
| Åsgard A / North Sea |
Verification of foaming |
Statoil |
Summer 04 |
| Ekofisk II / North Sea |
Demulsifyer test |
ConocoPhillips |
Summer 04 |
| Heidrun / North Sea |
Separators internals verification |
Statoil |
Spring 04 |
| Ekofisk II / North Sea |
Troubleshooting LP separator |
ConocoPhillips |
Spring 04 |
| Statfjord C / North Sea |
Solids qualitative analysis |
Statoil |
Winter 04 |
| Oseberg C / North Sea |
Antifoam chemical testing |
Norsk Hydro |
Winter 04 |
| Åsgard A / North Sea |
Antifoam chemical testing |
Statoil |
Winter 04 |
| Statfjord B / North Sea |
Well screening |
Statoil |
Fall 03 |
| Statfjord C / North Sea |
Antifoam chemical testing |
Statoil |
Fall 03 |
| Heidrun / North Sea |
Separators internals verification |
Statoil |
Fall 03 |
| Eldfisk / North Sea |
Demulsifier chemical testing |
ConocoPhillips |
Summer 03 |
| Åsgard B / North Sea |
MEG/TEG separator verification |
Statoil |
Spring 03 |
| Snorre TLP / North Sea |
2. stage separator verification |
Statoil |
Spring 03 |
| Alwyn North / North Sea |
TEG regeneration troubleshooting |
TOTAL, UK |
Spring 03 |
| Statfjord C / North Sea |
Start-up of low pressure operation |
Statoil |
Winter 03 |
Åsgard A / North Sea |
Capacity and antifoam testing |
Statoil |
Winter 03 |
Njord / North Sea |
Antifoam chemical testing |
Norsk Hydro |
Winter 03 |
Åsgard A / North Sea |
Baseline separators and scrubbers |
Statoil |
Winter 03 |
Troll C / North Sea |
1. stage sep. verification study |
Norsk Hydro |
Fall 02 |
Ekofisk II / North Sea |
Antifoam and demulsifier testing |
ConocoPhilips |
Fall 02 |
Troll C / North Sea |
Demulsifier chemical testing |
Norsk Hydro |
Fall 02 |
Njord / North Sea |
Foam/liq. carry-over sep./scrubber |
Norsk Hydro |
Fall 02 |
Statfjord C / North Sea |
Antifoam chemical testing |
Statoil |
Fall 02 |
Heimdal / North Sea |
Tuning of separation process |
Norsk Hydro |
Fall 02 |
Gullfaks A / North Sea |
Cap. test separator/scrubber/glycol |
Statoil |
Fall 02 |
| Ekofisk II / North Sea |
Flow regimes separators/scrubbers |
ConocoPhilips |
Fall 02 |
| Statfjord C / North Sea |
Start-up after modifications |
Statoil |
Summer 02 |
| Ekofisk II / North Sea |
Chemical optimization |
Phillips Pet. |
Summer 02 |
| Strathspey / North Sea |
Sand in oil determination |
Texaco, UK |
Summer 02 |
| Statfjord C / North Sea |
Scanning and separability testing |
Statoil |
Spring 02 |
| Ekofisk II / North Sea |
Gamma scan + UID of separators |
Phillips Pet. |
Spring 02 |
| Heidrun / North Sea |
Testing of labyrint chokes on wells |
Statoil |
Winter 02 |
| Ekofisk II / North Sea |
Scanning of HP sep. and scrubber |
Phillips Pet. |
Fall 01 |
| Kårstø / Norway |
Tracer test gas separator |
Statoil |
Fall 01 |
| Ekofisk II / North Sea |
Troubleshooting HP separator |
Phillips Pet. |
Fall 01 |
| Heidrun / North Sea |
Test separators verification |
Statoil |
Fall 01 |
| Gullfaks A / North Sea |
Scanning of separators |
Statoil |
Fall 01 |
| Oseberg A / North Sea |
Separability testing |
Norsk Hydro |
Summer 01 |
| Heidrun / North Sea |
Sediment control at wells start-up |
Statoil |
Summer 01 |
| Troll C / North Sea |
Capacity test separation train |
Norsk Hydro |
Spring 01 |
| Troll B / North Sea |
New well start-up testing |
Norsk Hydro |
Spring 01 |
| Brage / North Sea |
Separability of wells/1. stage sep. |
Norsk Hydro |
Winter 01 |
| Snorre TLP / North Sea |
Troubleshooting 1. stage separator |
Norsk Hydro |
Fall 00 |
| Troll C / North Sea |
Demulsifier test |
Norsk Hydro |
Summer 00 |
| Ekofisk II / North Sea |
Troubleshooting separators |
Phillips Pet. |
Fall 00 |
| Suncor / Alberta, Canada |
Separability study |
Suncor, Canada |
Fall 99 |
| Suncor / Alberta, Canada |
Mapping oil sand process |
Suncor, Canada |
Summer 99 |
| Midway Sunset / California |
Heavy oil mapping and sep. test |
Texaco, USA |
Summer 99 |
| Snorre / North Sea |
Minox deox. troubleshooting |
Saga |
Summer 99 |
| Gullfaks A / North Sea |
MTU, separation test |
Statoil |
Spring 99 |
| Ekofisk II / North Sea |
Troubleshooting gas scrubbers |
Phillips Pet. |
Winter 99 |
| Ekofisk II / North Sea |
Separator and inlet cyclones test |
Phillips Pet. |
Fall 98 |
| Xijiang / South China Sea |
Mapping |
Phillips China |
Summer 98 |
| Yme / North Sea |
Optimization |
Statoil |
Fall 97/ W 98 |
| Mariner / North Sea |
EWT, separability test |
Texaco, UK |
Fall 97 |
| Milne Point / Alaska |
Separator and dehydrators test |
BP Exploration |
Fall 97 |
| Eniricerche / Milano |
Heavy oil dehydr. and desalt. test |
Agip, Italy |
Summer 97 |
| Mongstad Refinery / Mongstad |
Desalter test |
Statoil |
Spring 97 |
| Yme / North Sea MTU |
Separation test |
Statoil |
Winter 97 |
| Alba / North Sea |
Mapping, heavy oil |
Chevron, UK |
Winter 97 |
| Frigg / North Sea |
Mapping |
Elf |
Winter 96 |
| Humble flow loop / Houston |
Maureen crude separation test |
Texaco, USA |
Fall 96 |
| Hermod (Grane) / North Sea |
Extended well test on heavy oil |
Norsk Hydro |
Summer 96 |
| Milne Point / Alaska |
Separation test |
BP Exploration |
Summer 96 |
| Pedernales / Venezuela |
Heavy oil separation test |
BP Exploration |
Summer 96 |
| MCF / Kongsberg |
Multiphase meter trials |
Kongsberg Offs. |
Spring 96 |
| Mariner / North Sea |
Well test, Maureen formation |
Texaco, UK |
Winter 96 |
| Orimulsion / Porsgrunn |
Separation test |
Bitor / Norsk H. |
Fall 95 |
| MP 290 / Gulf of Mexico |
Centrifuge test |
Shell, USA |
Summer 95 |