REFERENCE LIST - CRUDE OIL AND GAS SYSTEMS

Offshore troubleshooting, optimization, verification and testing of crude oil and gas systems. Testing tools in use are the Mini Test Separator (MTS) to determine the separability of fluids and identify problem wells, Neutron Backscatter technique to determine phase profiles inside separators, tracer technology for liquid carry-over, RTD and flow regime measurements, and MP-Sep and HYSYS for simulations.

Field / Location: Application: Operator: Time:
Ekofisk / North Sea Separators scanning and defoamer test ConocoPhillips Winter 10
Heidrun / North Sea Separator phase profile scanning after maintenance stop StatoilHydro AUtumn 09
Knock Allan - Olowi / Gabon West-Africa Troubleshooting of crude oil dehydration and desalination process plant Fred Olsen Production Ltd. Autumn 09
Oseberg A / North Sea Capacity Window Verification of Inlet 3p Separator StatoilHydro Autumn 09
Kristin / North Sea Production Chemicals Testing and Separator Phase Profil Scanning after Tyrihans Tie-in StatoilHydro Autumn 09
Heidrun / North Sea Separator phase profile scanning StatoilHydro Spring 09
Troll C / North Sea Troubleshooting of inlet 3ph separator StatoilHydro Winter 09
Hummingbird / North Sea Crude oil separability verification Sevan Marine Winter 09
Gullfaks C / North Sea Independent 3rd party verification of non-commercial inline technology StatoilHydro Winter 09
Heidrun / North Sea Separator phase profile scanning StatoilHydro Winter 09
Bressay Field UK / North Sea Extended well test heavy oil StatoilHydro Fall 08
Troll C - Fram / North Sea Verification of liquid carry-over by radioactive tracers StatoilHydro Fall 08
Foinaven / North Sea Desander testing Teekay Petrojarl Spring 08
Åsgard A / North Sea Testing of emulsion breakers StatoilHydro Spring 08
Ekofisk 2/4 J / North Sea Verification of three-phase separators ConocoPhillips Spring 08
Snorre A - Vigdis / North Sea Verification of liquid carry-over by radioactive tracers StatoilHydro Spring 08
Kristin / North Sea Process mapping oil train and produced water treatment StatoilHydro Winter 08
Eldfisk B / North Sea Gas Lift and Separation Study ConocoPhillips Winter 08
Snorre A / North Sea New defoamer verification StatoilHydro Winter 08
Ekofisk / North Sea Verification of separator condition ConocoPhillips Winter 08
Snorre B / North Sea Verification of separators condition StatoilHydro Fall 07
Oseberg C / North Sea New defoamer verification StatoilHydro Fall 07
Heidrun / North Sea Verification of separators condition StatoilHydro Fall 07
Yanga and Sendji / Congo Separation Optimization Total Fall 07
Rafnes / Onshore Bamble Thermography and de-bottlenecking Norsk Hydro Fall 07
Norne / North Sea New defoamer verification Statoil Fall 07
Halfdan / North Sea Verification of separators condition Mærsk Oil & Gas Fall 07
Heidrun / North Sea Verification of separators condition Statoil Summer 07
Heidrun / North Sea Emulsion breaker testing Statoil Spring 07
Tchibouela / Congo Verification of 3-phase separators performance Total Spring 07
Heidrun / North Sea New defoamer verification Statoil Winter 07
Kårstø / Onsh. Norway Liq. carry-over scrubbers (tracer test) Statoil Winter 07
Gullfaks C / North Sea Well screening Statoil Winter 07
Grane / North Sea Separator train and prodwater condition Norsk Hydro Winter 07
Ekofisk / North Sea Defoamer and capacity test ConocoPhillips Winter 07
Heidrun / North Sea New defoamer start-up Statoil Winter 07
Norne / North Sea Sep. verification and defoamer Statoil Fall 06
Gullfaks A / North Sea Defoamer optimization Statoil Fall 06
Troll C / North Sea Separators verification and em.breaker Norsk Hydro Fall 06
Heidrun / North Sea Defoamer optimization Statoil Fall 06
Grane / North Sea Verification of separators condition Norsk Hydro Summer 06
Snorre/Vigdis / North Sea Liq. carry-over scrubbers (tracer test) Statoil Summer 06
Heidrun / North Sea Defoamer and emulsion breaker Statoil Summer 06
Norne / North Sea Emulsion breaker testing Statoil Summer 06
Heidrun / North Sea Verification of separators condition Statoil Spring 06
Valhall / North Sea Verification on new well start-up BP Spring 06
Heidrun / North Sea Verification of separators condition Statoil Winter 06
Grane / North Sea Separators and prodwater verification Norsk Hydro Winter 06
Fram/Troll C / North Sea Capacity testing Fram Vest separator Norsk Hydro Winter 06
Gullfaks C / North Sea Well screening Statoil Winter 06
Statfjord B / North Sea Well screening Statoil Fall 05
Ekofisk / North Sea Separator and scrubber verification ConocoPhillips Fall 05
Grane / North Sea Separation troubleshooting Norsk Hydro Fall 05
Heidrun / North Sea Verification of separator condition Statoil Fall 05
Gullfaks C / North Sea Antifoam chemical testing Statoil Fall 05
Heidrun / North Sea Troubleshooting, interface optimiz. Statoil Summer 05
North Alwyn / North Sea Separation verification, troubleshooting Total, UK Spring 05
Valhall / North Sea Test of oil/water separation equipment BP Spring 05
Heidrun / North Sea Verification of separators condition Statoil Spring 05
Ekofisk II / North Sea Demulsifyer test ConocoPhillips Winter 05
Valhall / North Sea Separation verification, troubleshooting BP Winter 05
Åsgard B / North Sea MEG separator verification and antifoam testing Statoil Winter 05
Kolsnes / Onsh. Norway Liq. carry-over scrubbers (tracer test) Statoil Fall 04
Statfjord C / North Sea Antifoam chemical testing Statoil Fall 04
Grane / North Sea Separation verification, troubleshooting Norsk Hydro Fall 04
Statfjord B / North Sea Solids verifications before/after jetting Statoil Fall 04
Heidrun / North Sea Minox foam verifications Statoil Fall 04
Åsgard A / North Sea Antifoam chemical testing Statoil Fall 04
Ming Zhu / China Water in heavy oil verification ConPhil, USA Fall 04
Heidrun / North Sea Separators internals verifications Statoil Fall 04
Åsgard A / North Sea Verification of foaming Statoil Summer 04
Ekofisk II / North Sea Demulsifyer test ConocoPhillips Summer 04
Heidrun / North Sea Separators internals verification Statoil Spring 04
Ekofisk II / North Sea Troubleshooting LP separator ConocoPhillips Spring 04
Statfjord C / North Sea Solids qualitative analysis Statoil Winter 04
Oseberg C / North Sea Antifoam chemical testing Norsk Hydro Winter 04
Åsgard A / North Sea Antifoam chemical testing Statoil Winter 04
Statfjord B / North Sea Well screening Statoil Fall 03
Statfjord C / North Sea Antifoam chemical testing Statoil Fall 03
Heidrun / North Sea Separators internals verification Statoil Fall 03
Eldfisk / North Sea Demulsifier chemical testing ConocoPhillips Summer 03
Åsgard B / North Sea MEG/TEG separator verification Statoil Spring 03
Snorre TLP / North Sea 2. stage separator verification Statoil Spring 03
Alwyn North / North Sea TEG regeneration troubleshooting TOTAL, UK Spring 03
Statfjord C / North Sea Start-up of low pressure operation Statoil Winter 03
Åsgard A / North Sea Capacity and antifoam testing Statoil Winter 03
Njord / North Sea Antifoam chemical testing Norsk Hydro Winter 03
Åsgard A / North Sea Baseline separators and scrubbers Statoil Winter 03
Troll C / North Sea 1. stage sep. verification study Norsk Hydro Fall 02
Ekofisk II / North Sea Antifoam and demulsifier testing ConocoPhilips Fall 02
Troll C / North Sea Demulsifier chemical testing Norsk Hydro Fall 02
Njord / North Sea Foam/liq. carry-over sep./scrubber Norsk Hydro Fall 02
Statfjord C / North Sea Antifoam chemical testing Statoil Fall 02
Heimdal / North Sea Tuning of separation process Norsk Hydro Fall 02
Gullfaks A / North Sea Cap. test separator/scrubber/glycol Statoil Fall 02
Ekofisk II / North Sea Flow regimes separators/scrubbers ConocoPhilips Fall 02
Statfjord C / North Sea Start-up after modifications Statoil Summer 02
Ekofisk II / North Sea Chemical optimization Phillips Pet. Summer 02
Strathspey / North Sea Sand in oil determination Texaco, UK Summer 02
Statfjord C / North Sea Scanning and separability testing Statoil Spring 02
Ekofisk II / North Sea Gamma scan + UID of separators Phillips Pet. Spring 02
Heidrun / North Sea Testing of labyrint chokes on wells Statoil Winter 02
Ekofisk II / North Sea Scanning of HP sep. and scrubber Phillips Pet. Fall 01
Kårstø / Norway Tracer test gas separator Statoil Fall 01
Ekofisk II / North Sea Troubleshooting HP separator Phillips Pet. Fall 01
Heidrun / North Sea Test separators verification Statoil Fall 01
Gullfaks A / North Sea Scanning of separators Statoil Fall 01
Oseberg A / North Sea Separability testing Norsk Hydro Summer 01
Heidrun / North Sea Sediment control at wells start-up Statoil Summer 01
Troll C / North Sea Capacity test separation train Norsk Hydro Spring 01
Troll B / North Sea New well start-up testing Norsk Hydro Spring 01
Brage / North Sea Separability of wells/1. stage sep. Norsk Hydro Winter 01
Snorre TLP / North Sea Troubleshooting 1. stage separator Norsk Hydro Fall 00
Troll C / North Sea Demulsifier test Norsk Hydro Summer 00
Ekofisk II / North Sea Troubleshooting separators Phillips Pet. Fall 00
Suncor / Alberta, Canada Separability study Suncor, Canada Fall 99
Suncor / Alberta, Canada Mapping oil sand process Suncor, Canada Summer 99
Midway Sunset / California Heavy oil mapping and sep. test Texaco, USA Summer 99
Snorre / North Sea Minox deox. troubleshooting Saga Summer 99
Gullfaks A / North Sea MTU, separation test Statoil Spring 99
Ekofisk II / North Sea Troubleshooting gas scrubbers Phillips Pet. Winter 99
Ekofisk II / North Sea Separator and inlet cyclones test Phillips Pet. Fall 98
Xijiang / South China Sea Mapping Phillips China Summer 98
Yme / North Sea Optimization Statoil Fall 97/ W 98
Mariner / North Sea EWT, separability test Texaco, UK Fall 97
Milne Point / Alaska Separator and dehydrators test BP Exploration Fall 97
Eniricerche / Milano Heavy oil dehydr. and desalt. test Agip, Italy Summer 97
Mongstad Refinery / Mongstad Desalter test Statoil Spring 97
Yme / North Sea MTU Separation test Statoil Winter 97
Alba / North Sea Mapping, heavy oil Chevron, UK Winter 97
Frigg / North Sea Mapping Elf Winter 96
Humble flow loop / Houston Maureen crude separation test Texaco, USA Fall 96
Hermod (Grane) / North Sea Extended well test on heavy oil Norsk Hydro Summer 96
Milne Point / Alaska Separation test BP Exploration Summer 96
Pedernales / Venezuela Heavy oil separation test BP Exploration Summer 96
MCF / Kongsberg Multiphase meter trials Kongsberg Offs. Spring 96
Mariner / North Sea Well test, Maureen formation Texaco, UK Winter 96
Orimulsion / Porsgrunn Separation test Bitor / Norsk H. Fall 95
MP 290 / Gulf of Mexico Centrifuge test Shell, USA Summer 95


Back to the top



REFERENCE LIST - PRODUCED WATER SYSTEMS

Offshore troubleshooting, optimization, verification and testing of produced water systems. Testing tools in use are the Mini Test Separator (MTS) to determine the separability of fluids and identify problem wells, Malvern droplet size analyzer to verify efficiency of equipment, filter equipment to determine particle phase, and ProSep and HYSYS for simulations.

Field / Location: Application: Operator: Time:
Veslefrikk / North Sea Produced water optimization StatoilHydro Winter 10
Snorre A Vigdis / North Sea Produced water optimization StatoilHydro Winter 10
Aasgard B / North Sea Produced water optimization StatoilHydro AUtumn 09
Statfjord C / North Sea Ctour start up & optimization StatoilHydro Winter 09
Veslefrikk / North Sea Produced water troubleshooting StatoilHydro Autumn 09
Statfjord B / North Sea Ctour start-up & optimization StatoilHydro Autumn 09
Statfjord A / North Sea Produced water troubleshooting and optimization StatoilHydro Winter 09
Eldfisk FTP / North Sea Independent 3rd party verification of vendors technology - produced water ConocoPhillips Winter 09
Kristin / North Sea Produced water mapping ConocoPhillips Winter 09
Snorre B / North Sea Produced water mapping StatoilHydro Winter 09
Grane / North Sea Produced water mapping StatoilHydro Winter 09
Gullfaks C / North Sea Well screening and produced water mapping StatoilHydro Fall 08
Snorre B / North Sea Test of defoamer and produced water mapping StatoilHydro Fall 08
Troll C / North Sea Produced water Troubleshooting StatoilHydro Fall 08
Kristin / North Sea Process mapping oil train and produced water treatment StatoilHydro Winter 08
Foinaven / North Sea Produced water / PWRI mapping TeeKay/BP, UK Spring 08
Troll C / North Sea Separator train and produced water mapping Norsk Hydro Winter 08
Snorre B / North Sea Prod. water opt. and solids mapping Statoil Winter 08
Kristin / North Sea Produced water optimization StatoilHydro Winter 08
Statfjord B / North Sea Produced water optimization StatoilHydro Winter 08
Statfjord A / North Sea C-Tour optimization StatoilHydro Fall 07
Åsgard B / North Sea Flocculant testing and produced water mapping StatoilHydro Fall 07
Troll C / North Sea Separator train and produced water mapping Norsk Hydro Fall 07
Tyra / North Sea Produced water optimization Mærsk Oil & Gas Fall 07
Gorm / North Sea Produced water optimization Mærsk Oil & Gas Fall 07
Åsgard A / North Sea Flocculant testing Statoil Summer 07
Snorre B / North Sea Prod. water opt. and solids mapping Statoil Spring 07
Snorre B / North Sea Produced water optimization Statoil Spring 07
Foinaven / North Sea Produced water / PWRI mapping PGS/BP, UK Winter 07
Snorre B / North Sea Produced water mapping Statoil Winter 07
Gyda / North Sea Produced water mapping Talisman Fall 06
Norne / North Sea Flocculant testing Statoil Summer 06
Ekofisk / North Sea Produced water optimization ConocoPhillips Summer 06
Troll B / North Sea Produced water mapping Norsk Hydro Spring 06
Foinaven / North Sea PWRI optimization PGS/BP, UK Spring 06
Gullfaks B / North Sea Produced water mapping Statoil Winter 06
Heidrun / North Sea Flocculant testing Statoil Winter 06
Foinaven / North Sea PWRI verification PGS/BP, UK Winter 06
Britannia / North Sea Epcon test ConocoPhillips Fall 05
Gullfaks C / North Sea Produced water optimisation Statoil Fall 05
Ekofisk II / North Sea Prod. water and jetting system optimiz. ConocoPhillips Fall 05
Snorre A / North Sea Produced water system optimiz. Statoil Summer 05
Ramform Banff / North Sea Produced water mapping PGS, UK Summer 05
Brae / North Sea Epcon test Marathon, UK Winter 05
Heidrun / North Sea Flocculant testing Statoil Fall 04
Foinaven / North Sea Sand filter testing (PWRI) PGS/BP, UK Fall 04
Troll B / North Sea Produced water mapping Norsk Hydro Fall 04
Foinaven / North Sea Produced water chemicals testing PGS/BP, UK Fall 04
Oseberg FC. / North Sea Prod. water and well screening Norsk Hydro Fall 04
Gullfaks A&C / North Sea Prod. water optimisation Statoil Fall 04
Foinaven / North Sea Sand cyclone testing (PWRI) PGS/BP, UK Summer 04
West Alpha / North Sea Slop water centrifuge verific. Smedvig Summer 04
Heidrun / North Sea Mixer and flocc. testing Statoil Summer 04
Troll C / North Sea Epcon test Norsk Hydro Summer 04
Foinaven / North Sea Epcon test PGS/BP, UK Summer 04
Gryphon / North Sea Produced water test Kerr McGee, UK Spring 04
Troll B / North Sea Produced water optimization Norsk Hydro Spring 04
Troll B / North Sea Produced water test Norsk Hydro Spring 04
Norne / North Sea Prod. water mapping and flocc. test Statoil Spring 04
Statfjord C / North Sea C-Tour test Statoil Spring 04
Troll C / North Sea Produced water optimization Norsk Hydro Spring 04
Foinaven / North Sea Deoiler testing PGS / BP, UK Winter 04
Gullfaks C / North Sea Flocculant testing Statoil Winter 04
Foinaven / North Sea Particles in produced water (PWRI) PGS / BP, UK Winter 04
Troll C / North Sea Flocculant vessel optimization Norsk Hydro Winter 04
Foinaven / North Sea Hydrocyclone verification PGS / BP, UK Winter 04
Troll C / North Sea Produced water mapping Norsk Hydro Fall 03
Gullfaks B / North Sea Flocculant testing Statoil Spring 03
Statfjord B / North Sea Produced water mapping Statoil Fall 03
Troll B / North Sea Produced water mapping Norsk Hydro Fall 03
Statfjord B / North Sea C-Tour test produced water Statoil Summer 03
Heidrun / North Sea Produced water mapping Statoil Spring 03
Draugen / North Sea Produced water mapping Norske Shell Winter 03
Statfjord / North Sea Sand in prod. and jetting water Statoil/AkerKværner Fall 02
Troll B / North Sea Produced water mapping Norsk Hydro Fall 02
Statfjord C / North Sea Produced water mapping Statoil Summer 02
Visund / North Sea Produced water mapping Norsk Hydro Summer 02
Statfjord C / North Sea Produced water mapping Statoil Spring 02
Heidrun / North Sea Hydroflokk test unit Statoil Spring 02
Vigdis / North Sea Produced water mapping Hydro Winter 02
Heidrun / North Sea Hydroflokk test unit Statoil Fall 01
Gullfaks C/ North Sea Produced water mapping Statoil Fall 01
Troll B / North Sea Produced water mapping Norsk Hydro Fall 01
Gullfaks A/B / North Sea Produced water mapping Statoil Fall 01
Heidrun / North Sea Produced water troubleshooting Statoil Spring 01
Troll B / North Sea Drain centrifuge test Norsk Hydro Winter 01
Brage / North Sea Design basis for new prod. water Norsk Hydro Winter 01
Troll B / North Sea Prod.water system optimization Norsk Hydro Fall 00
Heidrun / North Sea Mapping produced water Statoil Fall 00
Mars TLP / Gulf of Mexico Produced water optimization Shell, USA Fall 00
Troll C / North Sea Prod.water system optimization Norsk Hydro Sum./Fall 00
Ekofisk II / North Sea Mapping produced water Phillips Pet. Winter 00
North Rankin / Australia Prod.water system optimization Woodside, Aust. Winter 00
Draugen / North Sea Hydroflokk test unit Shell Winter 00
Siri / North Sea Mapping produced water Statoil Fall 99
Knock Taggart / Nigeria Mapping produced water Addax Fall 99
Heidrun / North Sea Mapping produced water Statoil Winter 98
Gannet / North Sea Hydroflokk test unit Shell, UK Fall 98
Xijiang / South China Sea Mapping and separation test Phillips China Summer 98
North Rankin / Australia Mapping produced water Woodside, Aust Summer 98
RF-Rogaland Res. / Stav. Hydrocyclone test Rogaland Res. Winter 98
Yme / North Sea Hydroflokk test unit Statoil Winter 98
Yme / North Sea Mapping produced water Statoil Summer 97
Mongstad Ref. / Mongstad Desalter test Statoil Spring 97
Bruce / North Sea Mapping, gas / condensate field BP, UK Winter 97
Beryl Bravo / North Sea Mapping Mobil, UK Winter 97
Beryl Alfa / North Sea Mapping Mobil, UK Winter 97
Troll B / North Sea Mapping of Hydroflokk Norsk Hydro Winter 97
Alba / North Sea Hydrocyclone performance test Chevron, UK Winter 97
Frigg / North Sea Mapping Frigg / Frøy Elf Winter 96
Grane / North Sea Extended well test on heavy oil Norsk Hydro Summer 96
Tyra East / North Sea Centrifuge optimization Mærsk Fall 95
MP 290 / Gulf of Mexico Mapping / Chemical test Shell, USA Summer 95
Onshore / Porsgrunn Determ. of oil in sand in prod. wat. ABB Environm. Spring 95
Statfjord B / North Sea Hydrocyclone performance test Statoil Winter 95
Well 22/30C-13 / North Sea Well test Elf Fall 94
Statfjord A / North Sea Hydrocyclone performance test Statoil Fall 94
Tyra West / North Sea Centrifuge optimisation Mærsk Summer 94
Sleipner A / North Sea Mapping, gas / condensate field Statoil Spring 94
Onshore / Vindholmen Centrifuge test Merlin Winter 93
Ekofisk / North Sea Centrifuge test Phillips Pet. Fall 93
Tyra East / West / North Sea Centrifuge optimisation Mærsk Summer 93
Cognac / Gulf of Mexico Separation equipment test Shell, USA Spring 93


Back to the top



REFERENCE LIST - FEASIBILITY STUDIES/PROCESS DESIGN

Characterization tests to determine the separability of fluids, troubleshooting and recommendations, and process design of complete processes using MP-Sep, ProSep or HYSYS.

Field / Location: Application: Operator: Time:
Troubleshooting and recommendation:
StatoilHydro StatoilHydro Guidelines and technical requirements: Offshore oily water and sand treatment. StatoilHydro 2008/2009 StatoilHydrol 2008/2009
TeeKay Petrojarl Topside process study 16 API crude. TeeKay Petrojarl 2008
StatoilHydro Topside process study White Pearl gas/condensate. StatoilHydrol 2008
Foinaven Topside Upgrade and Debottlenecking TeeKay Petrojarl 2008
StatoilHydro Statfjord Produced water strategy StatoilHydro 2007
Alfa Laval Heavy oil - Technical market study Alfa Laval 2007
Piranema Chemical program Sevan Marine 2006
M7 Offshore Heavy oil process recommendations M7 Offshore 2006
Norsk Hydro Research Feasibility study LNG Norsk Hydro 2006
Petoro owned fields Status of zero discharge projects Petoro 2006
Oseberg Project Updated eval. of use of Methanol Norsk Hydro 2006
Siri FPSO design verification Teekay 2006
Nexus Generic FPSO topside design Rambøll Future 2006
Gullfaks Epcon study Statoil 2006
Typhonix Low shear valve areas of application Typhonix 2006
Statfjord C Techn. qualification sand cleaning Statoil 2006
Petoro owned fields Status of zero discharge projects Petoro 2005
Heidrun Influence from recirculated streams Statoil 2005
Statoil HYSYS model verification Statoil 2004
Oseberg Project Evaluation of use of Methanol Norsk Hydro 2004
Petoro owned fields Status of zero discharge projects Petoro 2004
Troll C (North Sea) Zero discharge recommendations Norsk Hydro 2003/2004
Troll B (North Sea) Zero discharge recommendations Norsk Hydro 2003/2004
Troll C (North Sea) 1. stage sep. verification study Norsk Hydro 2003
Petoro owned fields Verification of zero discharge reports Petoro 2003
Seillean FPSO 3. party verification of inlet cyclones Frontier Drilling 2003
Kollsnes MEG purification testing Statoil 1999
Baker Oil Tools (Stavanger) Completion fluids separation Baker Oil Tools 1999
Ekofisk II Inlet cyclones troubleshooting Phillips Pet. 1998
Heidrun Process troubleshooting Statoil R og ID 1998
Yme Overall troubleshooting Statoil 1997
Zuata (Venezuela) Heavy oil separation Norsk Hydro 1997
Frigg / Frøy Hydrocyclone operation Elf 1997
Heidrun Hydrocyclone optimization Statoil 1997
Gullfaks C Degasser modification Umoe Tech. 1997
Kapac Field (Indonesia) Process modification Clyde Petroleum 1996
Bali North (Jakarta) Hydrocyclone installation Arco 1996
Umm Al Dalkh (Middle East) Process modification CPC 1996
Central North Sea FPSO process evaluation Shell UK 1995
Process design:
New Field Process Design Client: TeeKay 2010
Bressay Produced water technology evaluation Client: Statoil 2010
Piranema Produced water treatment concept design Client: Sevan Marine 2009
Eldfisk Produced water treatment plant design AkerSolutions 2009
Eldfisk WiO reduction technology study ConocoPhillips 2009
Frøy Re-Development Process Design Client: Kanfa 2008
Maromba Process Design Client: Kanfa 2008
Tupi Process Design Client: Kanfa 2008
White Pearl Process Design Sevan Marine 2008
FPSOcean - Deep Producer 2 Process Design/Process Simulations Client: Kanfa 2008
Smart 2 H2S evaluation Aker Borgestad 2007
Gyda Participating in Upgrade Study Poyry 2007
Venture Pilot Process design Sevan Marine 2007
Gullfaks Separation year 2030 Statoil 2007
Typhonix Testing of Typhoon valve Typhonix 2007
Heidrun Minox modifications Vetco Aibel 2006/2007
Ekofisk 2/4 M Reject treatment ConocoPhillips 2006
Kårstø CO2 pilot plant Statoil 2006
Statfjord Technlogy qualification Statoil 2006
Fram East Mod. Fram Vest separator Norsk Hydro 2005/2006
Statfjord C Sand cleaning Statoil 2005
Chestnut Produced water study Client: Kanfa 2005
Ekofisk CTour 3. party verification ConocoPhillips 2005
Ekofisk PW separators Client: P.Halvorsen 2005
Knock Taggart New Field Dev. Heavy oil production Client: Kanfa 2005
Heidrun Produced water optimisation study Statoil 2003
Oseberg tie-in Condensate/water-MeOH/MEG sep. Norsk Hydro 2003
(General) Best Practice Produced Water Statoil 2001
Ekofisk II Process Eff. Monitoring study Phillips Pet. 2001
Heidrun Produced water optimisation study Statoil 2001
Oseberg East Booster pumps gas volume fraction ABB Offshore 2001
Brage Prod.water capacity increase ABB Offshore 2001
(General) Best Practice in Separation Statoil 2000/2001
Fram Vest Produced water system Norsk Hydro 2000
Grane Produced water degasser Kværner Process 2000
Bayu-Undan (Timor Sea) Condensate and Produced Water Phillips , Austr. 2000
Sleipner Oil Produced water study Statoil 1998
Yme Produced water modification Statoil 1998
Troll C Produced water degasser Kværner Process 1997
Mediterranean Ocean Heavy oil dehydr. and desalt. Agip 1997
Troll C Produced water system Norsk H/Umoe 1997
Tordis Subsea separation study ABB Offshore 1996
Heidrun Design verification prod. water Statoil 1996
Ekofisk II Produced water system Phillips Pet. 1996
Ekofisk II Produced water degasser Serck Baker 1996
Characterization test:
Adanga North tie-in (Nigeria) Separability study Addax 2006
Ekofisk CTour condensate separator study ConocoPhillips 2005
Akam tie-in (Nigeria) Separability study Addax 2005
Knock Taggart tie-in (Nigeria) Separability study Addax 2004
Oseberg tie-in Separability study Norsk Hydro 2003
Bohai Bay (China) Separability study Phillips Pet. 2000
Sazankurak (Kazakhstan) Separability study FIOC, USA 1999
Gullfaks Sør Statfjord Choke valve / demulsifier test Statoil 1999
Apache Legendre (Australia) Separability study Woodhill Thorn. 1999
Malampaya (Philippines) Separability study Brown&R / Shell 1998
Volve Separability study Statoil 1998
Yme Demulsifier test Statoil 1997
Draugen Demulsifier test Shell 1994
Douglas Field Separability study Hamilton 1993
Luihua (South China) Separability study Amoco 1993


Back to the top



REFERENCE LIST - Process separation seminars

An unique way to increase the understanding of gas/oil/water processes and the skills of operational personnel and process engineers. Seminars focusing on “Gaining insight in the separation process - from reservoir to the export pipeline”.

Field / Location: Contents: Operator: Time:
StatoilHydro Top-side processing for automation personnel StatoilHydro 2009
Snorre A C-Tour processing StatoilHydro 2007
Snorre B Top-side processing Statoil 2007
Gullfaks A/B/C Top-side processing for automation personnel Statoil 2007
Sulzer Top-side processing Sulzer 2006
Gullfaks B Top-side processing Statoil 2006
Gullfaks PLS / prodledere Top-side processing Statoil 2005/2006
Gullfaks C / North Sea Top-side processing Statoil Fall 2005
Gullfaks A / North Sea Top-side processing Statoil Winter 2005
Statfjord B / North Sea Top-side processing Statoil Winter 2004
Ekofisk 2/4 J / North Sea Top-side processing ConocoPhillips 2003/2004
Statfjord C / North Sea Top-side processing Statoil Winter 2003
Grane / North Sea Top-side processing Norsk Hydro Fall 2002
Gullfaks A / North Sea Produced water separation processes Statoil Spring 2002
Troll C / North Sea Top-side processing Norsk Hydro Fall 2001
Oseberg A / North Sea Top-side processing Norsk Hydro Spring 2001
Troll B / North Sea Top-side processing Norsk Hydro Spring 2001


Back to the top